Emergency Mountain Plateau Companion Bridge
2019-09-29

release time:

view count:

9


应急山地高原伴随桥


应急山地高原伴随桥

PRODUCT USAGE: 

 mainly used for mountain troops, motorized forces mobility, rapid construction of bridges, support wheeled vehicles and light tracked vehicles to quickly overcome the valley, crater and other natural or artificial obstacles; It can also be used to repair and reinforce existing bridges. 

Main parameters: 

bearing capacity: crawler load LD-30, wheel load LT-30, wheel shaft pressure 13t; bridge length 23m, bridge erection time 15 minutes, the number of operation (including drivers)3 people.

share to: