PRODUCT USAGE:
HZQL51 emergency mechanization bridge is a kind of large-span temporary bridge equipment which can be transported by automobile and be set up and taken down by bridge-erecting vehicle, for supporting heavy equipment, vehicles to quickly overcome within 50 meters of the river, dry ditch, mountain stream, swamp and other obstacles.
Main parameters:
maximum load of track type 60t, axle pressure of wheel type 13t; erecting length 17m, 25.5 m, 34m, 42.5 M, 51m; Erecting Width 4M; erecting time up to 70 minutes; erecting personnel 3 ~ 4(excluding drivers) .