Your current location:home pageNEWSLatest News
2022-05-20

date time:

Comprehensive Platform for Water Emergency Rescue Installed Recently

On May 19, it was informed by China Aneng Group Whan rescue base that the comprehensive platform for water emergency rescue, which was researched by China Aneng Group together with China Harzone, has been officially installed recently, adding a new tool for natural disaster engineering rescue.


The comprehensive platform for water emergency rescue, also known as pile-driving boat, consists of multiple boxes, with strong mobility, fast assembly speed, self-contained drive system, etc. When using the platform to crossing the river, there is no need to construct a dock, and the door bridge can be loaded and unloaded after docking using the self-contained diving board. As a large water rescue platform, it is able to support large equipment in the water rescue operations.


As a steel floating box combination platform for water operation, it can be modularized for transportation and be combined into a piling operation platform on water to achieve rapid arrival at the sealing site for piling and sealing. It is mainly used for piling operations in rivers, lakes and reservoirs after the occurrence of wind, overflow, collapse, breach and other disasters, and is able to effectively meet the rescue needs in the middle and lower reaches of the Yangtze River. Due to its high performance, the platform will not only enhance the ability of professional rescue teams to attempt the task but also ensure the safety of the rescue team members.

 

Comprehensive Platform for Water Emergency Rescue Installed Recently

share to: