Your current location:home pageNEWSTender Notice

Debugging of Movable Passenger Bridge Completed


2014-04-24

date time:

At the end of March, the debugging of the movable passenger bridge researched and manufactured by Harzone was completed. This movable bridge is controlled by a remoter, consisting of aluminum alloy span, steel structure rotating structure and hydraulic driver. The interval of opening or closing is 30s and the opening angle is 120 degree. 


share to: