CHIC Is Making Preparations for 140 Steel Bridges

2014-01-10

date time:

In order to reach the quality requirements in European and American market, perform the CB200 steel bridge manufacturing contract with Peru and build the internationalized image, the Emergency Bridge Division establishes a project team to make preparations. 


In December, 2013, the Emergency Bridge Division formulates and perfects Procedures and Rules on Management of Technology and Techniques and Quality Control Measures on Outsourcing Products, covering drawings, information, identification, inspection method, sampling proportion, claim, quality of outsourcing products, so as to reach top product quality and satisfy the demand of customers. 


share to: