Hzfq60 Emergency Belt Pontoon Bridge
2019-09-29

release time:

view count:

13


HZFQ60应急带式舟桥

HZFQ60应急带式舟桥


Product performance: 

The product is a four-fold belt type pontoon bridge equipment, used in emergency or abnormal conditions, quickly set up through the floating bridge, can be assembled into 40 t, 60 t, 110 t of the caoduomen bridge, support heavy equipment and vehicles to quickly overcome the flow rate not more than 2.5 m/s small and medium-sized rivers, lakes and other obstacles. 

Main parameters: 

Full set of Pontoon Bridge Length 109 meters (Foreign Trade) , lane width 6.5 meters; maximum traffic load crawler-type 60t, 13t wheel axle pressure; full set-up time 45 minutes.

share to: