HZ Elevated Pontoon Bridge

 

 

Product performance:

HZ Elevated Pontoon Bridge is also called 3rdGeneration Heavy Pontoon Bridge in China, which is a new type of river-crossing equipment for rapid erection of access in a state of emergency or abnormal condition to guarantee heavy equipment and vehicles to rapidly overcome the medium and large rivers and lakes as well as rivers with high velocity such as Yangtze River and Yellow River. It may be assembled into ribbon pontoon bridge, elevated pontoon bridge as well as ferry of varied sizes. It is one of the international most advanced pontoon bridge. It has won the First Prize of National Science and Technology Progress Award.  

 

Major parameters:

Max. design load for pontoon bridge

Tracked load 60t, wheel load axial pressure13t

Max. roadway width for pontoon bridge  

4.5 meters

Erection time for 100m pontoon bridge

40min

Max. load for ferry

120t

Max. water velocity 

3.5m/s