HZ100 Soft Mobile Pavement

 

Product performance:

It is mainly used for temporary pavements paved at sections with low carrying capacity such as the beach, mud, snowfield, swamp as rapidly-paved emergency channel to guarantee wheeled equipment overcome all kinds of mudflat obstacles. The material of pavement is non-metallic composite polyester.

 

Major parameters:

Pavement length

100m ~200 m

Pavement width

3.6m ~4.2 m

 Design load

wheel load axial pressure: 13T

Mode of operation   

Mechanized front and back laying and back roll-up

Completion time

15 minutes