HZ 51m Mechanized Bridge

 

Product purpose:

HZ 51m Mechanized Bridge is a kind of large-span temporary bridge transported with vehicles, erected and dismantled witherection vehicles. It is used for guaranteeing heavy equipment and vehicles to rapidly overcome barriers such as rivers, ditches, creeks and swamps within 50 meters.

 

Major parameters:

Maximum tracked load           60t                             Bridge length    17m, 25.5m, 34m, 42.5m, 51m 

Maximum axle load                13t                             Erection time                      70min  

Operator                 3~4(excluding drivers)