HZ Light Mountains Bridge

 

 

Product purpose:

HZ Light Mountain Bridge is mainly used for accompanying mountain and plateau troops, motorized troops to rapidly erect bridges, guaranteeing wheeled vehicles and light tracked vehiclesto rapidly overcome natural or artificial barriers such as river valleys, crater, etc.; in addition, it can also be used for repairing, reinforcing existing bridges.

 

Major parameters:

Maximum tracked load           LD-30t                   Bridge length                       23m 

Wheel load LT-30,  axle pressure 13t                   Erection time                      15min  

Operator                                   3